Traffic management · Teesside and the North East

Signs, cones and lamps, and the checks on the set-up.

A traffic management job leaves a van full of signs, cones, lamps and barriers on a stretch of road. After the shift, some of it comes back and some of it does not. Daily checks that the layout is still as planned, that lamps are working at night, and that the permit or road space is still in date, often live on a paper sheet in the cab. Site Checks holds the check and the kit list.

  • Shift checks of the set-up, on the phone
  • Signs, cones and lamps booked to the job
  • Permit and road-space dates against the work

An illustration of the idea, not a screenshot from a real firm or a live client.

The problem

What stays on the road should not be a scavenger hunt.

Traffic management kit leaves the yard in a known quantity and comes home in the dark. The check on the set-up, and the count, need a home other than the cab.

Collections that are a walk along the verge

Signs, cones and lamps were left out for a later phase. The collection crew cannot see a list of what is still on that stretch, so the last sign is found the next week, or not at all.

Night-time lamp checks on a pad

The shift check was done, including the lamps. The sheet stays in the cab, gets wet, or is not there when the office is asked whether last night's check happened.

A permit date in a different diary

The road space or permit has an end date. If it only lives in an email, it is easy to miss, and the set-up is still on the road after it should have come up.

Damage with no photo from the shift

A sign frame is knocked, a lamp is missing, a cone line is short. Without a record from the shift, it becomes an argument later, or a short count that nobody can explain.

Checks and registers

The shift check, the permit, and the kit on the road.

Site Checks records the checks and the kit you already manage. It is not a traffic-management design tool, and it does not produce a layout drawing.

Shift or daily check of the set-up

Complete the check on a phone: the layout as planned, knocked signs, lamp function at night, signed and saved to the job.

Kit booked to the job

Check out signs, cones, lamps, barriers and chapter 8 kits against that job, so a collection is a list, not a walk along the verge.

What is still on the road

See what has not come back, including kit left out for a later phase, so overdue collections are visible to the office as well as the gang.

Permit and road-space dates

Put the start and end date against the job, so an expiry is sitting with the work, not only in an inbox.

Damage and missing items

Log a knocked frame, a missing lamp or a short cone line, with a photo if you want one, when the kit comes back or during the shift.

Your sheet, in your colours

We put your current shift-check or kit sheet into the app. The first paper form is converted free of charge.

Site Checks records the checks and the kit list you complete. It is not a traffic-management design tool, and it does not replace a designed layout, a permit application, or the judgement of a qualified traffic management operative.

Send a photo of one paper form. Get it back as an app form, free.

Email a photo of one of your paper shift-check or kit sheets to hello@doddsworks.co.uk and I will put it back to you as an app form, free of charge.

Email a form photo
How it works

Load the van, check the stretch, bring it home.

01

Book the kit out

Signs, cones, lamps and barriers are booked to the job before the van leaves, so the office has a starting list.

02

Do the shift check

The set-up is checked on the phone, including lamps at night, and the permit date sits on the same job.

03

Collect against the list

When the work comes up, check the kit back in. Shortages and damage are on that job, not only in the cab.

Open the Site Checks demo See equipment tracking

A live demo with made-up sample data, not a real traffic management firm. Use the equipment section to see how kit is booked to a job.

The shift check lives in Site Checks. The signs, cones and lamps live in equipment tracking. It is one app, in your logo and brand colours, with no setup fee. Your records leave with you as a folder of standard files, any time.

See Site Checks
Prices

The same Site Checks plans. No extra product to buy.

Every plan includes the full app, including equipment tracking, and unlimited users. 15 users on 3 sites is £219 a month, with no per-user fees. There is no setup fee — we load your kit, people and jobs as part of getting started.

Starter

One site, or one yard and the jobs it serves.

£89/month

1 site · unlimited users

  • Equipment tracking included
  • The full Site Checks app
  • Unlimited users
Get a version in your colours
Most popular

Contractor

Up to three sites, for a firm running more than one job at a time.

£219/month

Up to 3 sites · unlimited users

  • Everything in Starter
  • Up to three live sites
  • Unlimited users
Get a version in your colours

Regional

Up to ten sites, for a firm covering a wider patch.

£499/month

Up to 10 sites · unlimited users

  • Everything in Contractor
  • Up to ten live sites
  • Unlimited users
Get a version in your colours

Plans run month to month after a three-month minimum, not twelve. No VAT added. The first three North East firms get a free 30-day pilot. After 30 days you can carry on at Starter for £71.20 a month for year one (20% off £89), or you can stop.

FAQ

Straight answers.

Something else on your mind? Email hello@doddsworks.co.uk and I will answer it.

Does this design the layout or produce chapter 8 drawings?

No. It records the shift check and tracks the kit. If you already attach a drawing or a permit to a job, you can keep doing that. The app does not design the set-up.

We work nights and on poor signal. Will it still work?

Site Checks is built to work offline, then sync when the phone has a signal again. That matters on a stretch of road as much as it does on a plot.

Can the office see last night's check in the morning?

Once the phone has synced, the signed check is on the job, including any photos of defects. The office does not have to wait for a pad to come back in the van.

What does it cost?

Starter is £89 a month for one site, Contractor is £219 for up to three, Regional is £499 for up to ten. Unlimited users, no setup fee, three-month minimum. The first three North East firms get a free 30-day pilot. After 30 days you can carry on at Starter for £71.20 a month for year one (20% off £89), or you can stop.

Get started

Get a traffic management version in your colours.

Email Curtis at hello@doddsworks.co.uk. Tell me how you do shift checks today, and how you track signs, cones and lamps. You will get a proper reply by email, not a sales call.

Email about Site Checks
hello@doddsworks.co.uk
  • Your company name
  • How you do shift checks today
  • How you track signs, cones and lamps
  • A photo of one paper sheet, if you have one