The Provision and Use of Work Equipment Regulations 1998 (PUWER) require work equipment to be suitable, maintained, and inspected where necessary. If you also hire out lifting equipment, thorough examinations under the Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) are a separate legal duty, usually at 6- or 12-month intervals depending on the equipment.
Site Checks can hold a record of pre-use checks and of when an examination is due. It does not carry out the examination, it does not replace a competent person, and it does not make a machine “compliant” on its own.