A short count at the end of a contract is a familiar feeling on a scaffold yard. Boards, tubes and fittings move from job to job, and unless they were booked out against a site, it is hard to say whether they are still on the job, in another contractor's stack, or gone for good.
The ways tubes, boards and fittings go missing on real jobs
What the scaffolding trade body itself flags as a theft risk
A calculator that uses your own numbers, not made-up averages
Yard board Sample illustration
Not back — last jobStill on site
Checked in this morningIn the yard
No starting figureShort count
Booked out, due FridayOn hire
Damage logged at returnWorkshop
An illustration of the idea, not a screenshot from a real firm or a live client.
How kit goes missing
The ways yards actually lose it.
These are the everyday patterns, not a claim about what your firm loses. Your figure belongs in the calculator further down.
The short count at dismantle
The job comes down, the wagon comes in, and the count is light. Fittings have a way of sitting in a corner, falling into a skip, or ending up in another contractor's stillage on a shared site. Without a starting figure booked to that job, you are guessing how short you really are.
“It will come back with the next load”
A few boards and a bag of fittings are left for a follow-on visit, or because the wagon was already full. Weeks later the site has moved on, the boards have been used as walkways or protection, and nobody is quite sure who was meant to bring them in.
Theft, and stock that goes for scrap
Tube, boards and fittings are valuable enough to steal and small enough to shift. The National Access & Scaffolding Confederation lists asset and equipment theft of tube, boards, fittings and high-value ancillary kit as a risk in its fraud guidance. Loose, unmarked stock is the hardest to prove was yours.
Buying again before the next job
The next contract starts on Monday. You have no time to keep ringing the last three sites, so you buy or hire in more fittings. The short count has already cost you, even if some of the old stock turns up later.
None of that needs a national average to be true. Anyone who has run a scaffold yard already knows the pattern. The useful question is not “what does the industry lose?”, which nobody can answer honestly for your firm. It is “what does this cost us, on our numbers?”
Site Checks does not invent a saving for you. It gives you a check-out and check-in against the job, so a short return is visible, and a board you can look at on your phone instead of relying on the whiteboard or a book in the van.
Sources
What we can point to, and nothing we cannot.
Every claim on this page that is not a description of how a yard works has a source. There are no testimonials, and no made-up industry averages.
The National Access & Scaffolding Confederation (NASC) published CG28:26, Fraud Awareness and Prevention for Scaffolding Contractors and Suppliers, on 6 August 2026. It lists “asset and equipment theft: tube, boards, fittings and high-value ancillary items such as fall recovery and tie testing equipment” among the main fraud and theft risks facing the sector.
NASC also publishes APG1:21, Asset Protection for the Scaffolding Industry. It replaced earlier guidance notes on stock control, reporting theft to the police, and vehicle theft, and is intended to help firms plan how they protect assets and what to do if a theft happens.
Buying and selling scrap metal in England and Wales is regulated. A scrap metal dealer must be licensed by the local authority under the Scrap Metal Dealers Act 2013. That does not stop fittings going missing, but it is the legal backdrop when stock is suspected to have been sold as scrap.
This is the same calculator as on the lost-kit calculator. Every line uses only what you type. Nothing is sent anywhere until you choose to email the result or copy a link.
Your estimate
£0
a year in lost kit, time, hire days and disputes (£0 a month)
Lost or written-off kit£0
Time chasing and finding kit£0
Hire days lost£0
Damage disputes£0
Per item out, per year£0
Doddsworks Starter£89/mo£1,068 a year
Loose kit costs you£0/mo£0 a year
…
This is an estimate from your own numbers, not a promise of savings. How much an app actually cuts these costs depends on your yard and how your team uses it.
No hidden numbers. Every line uses only what you typed above.
Lost kit items lost a year × replacement value
–
Chasing time hours a week × hourly cost × working weeks
–
Hire days lost days lost × day rate
–
Disputes disputes a year × average cost
–
Yearly cost sum of the four lines
–
Doddsworks plan a year monthly price × 12
–
Break-even plan a year ÷ yearly cost: the share of that cost the app would need to stop to pay for itself
–
Site Checks
What the app actually does.
It will not promise a saving. It will show you where the kit is, who has it, and when it is due back, on your phone.
01
Book the bay out to the job
Check tubes, boards and fittings out against a site, and back in when the job comes down, so a short return sits on that job rather than in a pile in the yard.
02
See what is still out
A simple board on your phone of what should have come back, instead of ringing every ganger to ask who still has the fittings.
03
Keep the inspection record with the stock
Handovers and seven-day inspections live on the same job as the kit list. That is the scaffolding product page, not a second system.
A live demo with made-up sample data, not a real firm. Equipment tracking is part of Site Checks, from £89 a month, with no setup fee and unlimited users.
The first three North East firms get a free 30-day pilot of Site Checks on one site. I load your kit list. There is no card up front. After 30 days you can carry on at the founding price — Starter at £71.20 a month for year one, instead of £89 — or you simply stop. If you continue, the usual three-month minimum applies, and invoices are paid by bank transfer on 14-day terms.